太阳集团娱乐场登陆网站|欢迎您

Telephone

+86-0515-68663128

产品服务
Main Welding Line
Main Welding Line
PURSUE PERFRCTION CREATE EXCELLENCE PRIDE PENETRATS CHANGHONG

Main welding line of the vehicle body is composed of frame, engine cover, trunk cover and the welding assembly of doors. While the frame structure is composed of floor welding assembly, front longeron on the left and right and wheel housing assembly, the left and right side welding assembly, the front welding assembly, rear dam-board, longeron on the left and right side and the rear wheel housing assembly and rear welding assembly.

Telephone

+86-0515-68663128

Address

No.268, Huanbao Avenue, Tinghu District, Yancheng City, Jiangsu Province

Copyright © 2015 Changhong All Rights Reserved 版权所有 太阳集团娱乐场登陆网站 苏ICP备16044561号-2